SR 3/Northside Drive @ CS 53/Collier Road
|
SR 3/Northside Drive @ CS 53/Collier Road; CS 364; 38; 6; 135 |
Georgia Department of TransportationFact Sheet |
General Definition/Description of Project:
- The proposed project consists of roadway and waterline improvements along Northside Drive/SR3/US41 from I-75 to just north of the Northside Drive/Northside Parkway intersection. The project has a total project length of 2.46 miles.
- The roadway portion of the project from I-75 to Collier Road includes converting the existing reversible lane to a two-way left turn lane with an exclusive left turn lane onto Collier Road. In addition, a right turn lane will be installed for the northbound Northside Drive movement turning onto Collier Road eastbound.
- From Collier Road north, the work includes converting the reversible lane to a two-way left turn lane until it connects to the existing 4 lane section.
- Signal equipment and pedestrian accommodations will be upgraded at the intersections of Collier Road, Woodward Way, Peachtree Battle Avenue, West Wesley Road, and Arden Road.
Also a water line main and sewer line main will be included in the contract for this project.
- This Project is Schedule for a June 2012 Let
When: The project is schedule for a June 2012 Let Date with a Contract time for roadwork and waterline work of 24 months. The estimated completion date is June 2014.
Why: This project is anticipated to improve the safety and efficiency of Northside Drive by removal of the reversible lane, installation of a turn lane at Collier Road, providing pedestrian accommodations throughout the corridor and installation of the City of Atlanta waterline to avoid multiple projects in the area.
2010 Average Daily Traffic/ 2030 Design Traffic ADT
State Route 3/ Northside Drive– 23,600 State Route 3/ Northside Drive – 29,100
Current Posted Speed: 35 MPH
Speed Design: 35 MPH
To receive email updates on the project email Mark McKinnon at mmckinnon@dot.ga.gov
Georgia DOT urges travelers to call 511 for updated information about this or any other construction project on interstates and state routes. Georgia 511 is a free phone service that provides real-time traffic and travel information statewide, such as traffic conditions, incidents, lane closures, and delays due to inclement weather. Callers also can transfer to operators to request assistance or report incidents 24 hours a day, seven days a week. More information is available at www.511ga.org. For information on the Department of Transportation, visit (www.dot.ga.gov); you also may follow Georgia DOT on Facebook (http://www.facebook.com/GeorgiaDOT) and Twitter (http://twitter.com/gadeptoftrans).
###